ITEM 9780

Ceduna Coaxial Cable blasting

About this Collection

This the Blasting Stage of the Cobar to Ceduna Coaxial Cable Project with Project Manager John Cooper explaining the type of rock encountered as it was impossible to rip it with the D9 Ripping Tractors so they had to resort to using Track Drills so the Blasting is to follow.